Our Projects

Sport and Recreation PROJECTS Scarborough Foreshore Redevelopment and Pool
Project categories

ETC has delivered a truly holistic solution for the electrical services to the precinct with a unique power distribution network that has the potential of delivering real Alternate Energy Systems.  The proposed HV reticulation can be interfaced with Hybrid Solar, PV, Wind Energy and Battery Storage systems to reduce dependence on the electrical network, and utilise renewable energy during peak demand periods.

The Foreshore Precinct and Pool project are interconnected via a shared communication fibre network accommodating services such as security, WiFi, lighting control, bore control, systems monitoring and emerging technologies to be catered for throughout the precinct via communications nodes.

ETC's master planning, design development and design documentation role included:

  • Power supply and distribution
  • Fibre optic communications network
  • Security/CCTV
  • Events and performance power for a new Intergeneration Skate Park and Bouldering Walls
  • WiFi provisioning
  • Renewable energy strategy
  • Pool services
  • Decorative feature lighting to pool building and surrounds, choreographed across the precinct